Public Water

Classified Categories: Archived

The City of Red Deer Logo

Public Water

Hydrant Fountain Project

The application deadline for this opportunity has passed.

Artists, makers, tinkerers, amateur engineers of aqueducts.

Thoroughly inspired by creative hydrant fountain projects in other communities, the water department at The City of Red Deer is seeking proposals for two hydrant-fountain projects.

Proposed projects act as an innovative appendage and drinking fountain for the public that also highlights the importance of providing access to drinkable water for all. The project speaks to the importance of using refillable water bottles and the movement away from bottled water and single-use containers.

Hydrant Fountain Project A: Is a semi-permanent hydrant-fountain artwork/appendage that will be located on the Ross Street Patio in downtown Red Deer. The patio is a hive of activity all summer and early fall with music, performers, food, and entertainment. The fountain will be installed and maintained each year by the water department and be active from late spring through fall. The fountain will be removed and stored during the winter.

Hydrant Fountain Project B: Is a portable hydrant-fountain artwork/appendage that will be installed temporarily on a hydrant for special events throughout the community.

Basic Technical Specifications to Consider

  • The materials used must be non-toxic and suitable for drinking from.
  • The artwork/appendage design should be low maintenance and use parts that are easily repaired or replaced.
  • The design or concept must be unique/original and stand out as something quite different from a typical water fountain or fire hydrant.
  • Project A should have a footprint of no more than 1.5 meters from the hydrant base.
  • Project B should be lightweight and portable/relatively easy to set up/transport.

Budget

Up to $5,000.00 per project including artist fees, materials, and installation.

Timeline:

  • June 10, 2019 – Call launched.
  • June 26, 2019 – Deadline for submissions.
  • June 28, 2019 –  Artist’s notified.
  • July 27, 28, 2019 (for Centrefest) – Projects Installed/launched/or performed as installation (ideally, however, the deadline is negotiable).

Submit your ideas, sketches and proposals by June 26, 2019!

Submissions:

  • One to three pages that include sketches or diagrams and proposed description of project A, B/or both.
  • Examples of past projects as images or a link to a website or social media.
  • A budget that includes material costs, artist fee, installation and other associated costs.
  • A CV, resume or summary of your related experience as an artist or maker and contact details

Please send all submissions to info@reddeerartscouncil.ca. Submissions will be reviewed by a team of enthusiastic individuals from the Red Deer Arts Council, The City of Red Deer, and the Downtown Community Development Committee.

Visit the project New Public Water by artists Tei Carpenter and Christopher Woebken for ideas and inspiration on other hydrant based artworks at urbanomnibus.net.

For site images and hydrant details email kelly.andres@redddeer.ca.

A photo of Tei Carpenter and Christopher Woebken drinking out of Hydrants for All, New Public Hydrant
Hydrants for All, New Public Hydrant, Tei Carpenter and Christopher Woebken | Photo: Courtesy of the artists
Share this page
Share